Wiring the Typhoon Full Function Controller

 

When wiring the Typhoon Full Function, please remember not to exceed 3.5Amps per button. When you overload the Typhoon Full Function Controller it may make a sound/perform a function briefly, then turn off. This is a built in safety feature that will help protect the Typhoon Full Function Controller from electrical surges. 

 

Step 1: Run a 12-14 gauge wire to a known good grounding location, we recommend the batteries negative terminal. Once ran, connect the ground wire to the 12v-DC slot on the Typhoon Full Function. 

Step 2: Run a 12-14 gauge wire to your batteries 12v+ terminal and wire that into the Typhoon Full Function 12v+DC slot.

Step 3: Begin wiring in your products to the Typhoon Full Function 

Step 4: Program the buttons on the Typhoon Full Function Controller to match what you have wired into the unit or desired functionalities.

Step 5: Test Functionality. If some products do not work, please inspect your wiring for defects. 

Step 6: If all of your wiring is correct and the product is not overloaded, please contact Feniex Technical Support for assistance (1-800-615-8350)

For all other Typhoon Full Function Controller inquiries please see the appropriate articles or go to our website and research the literature for this product.